We have been performing work throughout the Pacific Northwest for over 20 years. Our recent work is below. Please click on projects below for more details.

Project Divisions:

Project Map

Repairs in progress
334

Riverpoint Condominiums 2016 / Portland, OR

Restoration of this iconic complex included replacement of the entire building envelope, windows, exterior decks, and portions of the roof.  The project maintained the original look and feel of the complex while updating it to a modern building envelope.
294

River's Edge Hotel and Avalon Condominiums 2015 / Portland, OR

River's Edge Hotel and Avalon Condominiums occupies a unique building which combines several tenants and styles.  The building was originally constructed in 2001 as the Avalon hotel with a 99 room hotel and spa with condominiums on the upper floors.  In 2014 the Singerman group acquired the building and began the process of renovating the business and the building.
working in public areas to minimize impact
330

Samaritan Village Senior Living 2015 / Corvallis, OR

This 83 unit senior living complex was constructed in the mid 1950s.  In typical fashion for the time the buildings were well constructed with what are small and cramped bathrooms and kitchens for today.  We are working with Samaritan Village and Cascade Management to update the spaces and improve their usability for residents.
Courtyard Scaffolding
270

The Addison Exterior Maintenance 2014 / Portland, OR

The Addison was in need of several types of maintenance in repair work approx 10 years after initial construction.  With a tight site and difficult access the most effective solution was perform several types of work at once.
213

Rockaway Shores Condominiums 2014 / Rockaway Beach, OR

Rockaway Shores Condominiums was in need of a complete exterior cladding, deck and roof repairs due preexisting moisture damage. The scope of work for the four story with below grade parking structure included removal and replacement of fiber cement siding, flashing, WRB, sheathing, installation, exhaust vents and trim. In addition the scope of work also included the removal and replacement of the storefront entry assembly, unit decks and roof assembly.
During Construction
229

Seascapes Townhomes 2014 / Rockaway Beach, OR

Seascape Townhomes was in need of exterior envelope, cladding and deck repairs due to pre-existing moisture damage. The scope of work for the 6 buildings consisted of replacing all fiber cement siding, trim and WRB, rebuilding and replacing deck structures and glass rails, and installing waterproofing system and high performance flashing.
130

Eastwood Court 2013 / Portland, OR

This community revitalization project consisted of repairing and refreshing a 9 building apartment complex for Home Forward.  We conducted extensive framing repairs, repalced the building envelope, replaced windows, installed new siding, and repainted the entire property.
165

Meridian Village Townhomes 2013 / Beaverton, OR

The townhomes at Meridian Village suffered from siding and building envelope problems due to poor material selection and installation.  Repairs included siding and building envelope replacement, window replacement, dryrot and framing repairs, and partial roof repairs.
Work Completed
197

Conor Commons 2013 / Beaverton, OR

This association suffered from several consistent issues related to roof valleys, window integration, weather barrier installation, and structural framing.
204

Vintage Creek Townhomes 2013 / Sherwood, OR

The multifamily defect restoration project involved 71 townhomes which required exterior envelope repairs.  I&E Construction worked with the community manager and the HOA board to successfully restore these homes.
208

Christy Court 2013 / Winston, OR

Christy Court is a 34 unit rural apartment community in Winston, OR.  The owner wanted to improve the complex with some simple upgrades.  Replacing the sliding glass doors and exterior decks delivered great value in improving this community.
116

Arbor Reserve 2012 / Beaverton, OR

Arbor Reserve is a 202 unit townhome community which struggled with leaks and building envelope issues for several years.  Repair work consisted of partial siding and building envelope replacement, removal and reintegration of all windows, roof repairs, framing repairs, recoating of membrane decks, and new paint.  
Exterior repairs
117

Hambach Crossing 2012 / Tigard, OR

This multifamily defect restoration project involved 30 townhomes which required extensive exterior envelope repairs.  
119

Rockwood Station 2012 / Portland, OR

Rockwood Station is an early 1990's apartment complex in need of repairs and restoration.  We completed repairs on the first building consisting of exterior envelope replacement, framing repairs, deck replacement and coating, and minor roof repairs.
158

Mosier Creek Townhomes 2012 / Mosier, OR

This 34 unit townhome and flat development required repairs and remediation in part due to their unique environment.  Mosier, OR sits at the intersection of the Eastern Oregon high desert and the Columbia River Gorge.  Mosier routinely experiences unusually high winds and rain which contribute to building envelope challenges which required repairs.
Before Construction
205

Clayborn Condominiums 2012 / Portland, OR

Clayborn Condominiums was originally constructed as part of an apartment complex in 1990.  They were subsequently converted to condominiums and in 2010 were in need of exterior restoration.
Work in progress at Graham Street
206

Graham Street Lofts 2012 / Portland, OR

Graham Street Lofts required remediation of several original construction defects. This challenging partial repair consisted of reintegrating windows, deck coating replacement and partial replacement of stucco and siding.
Sheathing and roofing replacement
118

Oak Creek Meadows 2011 / Aloha, OR

This challenging project for C&R real estate involved extensive structural repairs, building envelope replacement, and window replacement. 
211

Columbia Shores Condominiums 2011 / Vancouver, WA

Columbia Shores is a multifamily defect restoration project. I &E Construction performed a complete restoration of the 140 unit complex. The work included removing the existing building envelope and cladding, repairing dry rot and structural system, installing new building envelope and rainscreen, new siding, new windows and replacing roofs.
162

Collins Lake 2009 / Government Camp, OR

This project is in a small mountain town at the base of Mt. Hood.  Because of being heavily affected by the seasons, it was imperative this project be started and finished within a very specific time window of 3 months.   This was made even more difficult by the tight narrow confines of the small community.