503-655-7933

Water Pollution Control Facility Phase B-2A

Modifications to two existing Headworks biofilters and existing biofilter irrigation system. Assembled and balanced new 36" HDPE foul-air piping in existing Headworks structure and applied specialized coatings at fan building.

Location