I & E Construction

-

Projects

We have been performing work throughout the Pacific Northwest for over 20 years.  Our recent work is below.  Please click on projects below for more details.

Project Divisions:

Project Map

Repairs in progress
334

Riverpoint Condominiums 2016 / Portland, OR

Restoration of this iconic complex included replacement of the entire building envelope, windows, exterior decks, and portions of the roof.  The project maintained the original look and feel of the complex while updating it to a modern building envelope.
Front of Residence
335

The Columbia Residence 2016 / Happy Valley, OR

The Columbia Residence is a new construction two story townhome located in Happy Valley, Oregon.
Crest View Townhomes
237

Crest View Townhomes 2016 / Happy Valley, OR

Crest View Townhomes provides 70 two-story townhomes on 6.55 acres with a clubhouse and in-ground pool. Please visit www.crestviewtownhome.com for sales information.
336

Westmoreland Apartment Building 2016 / Portland, OR

The Westmoreland Apartment building is a new three story 8,517 SF complex located on a 5,004 SF Lot. The complex provides 15 studio, one and two bedroom apartment units with enclosed bicyle storage. The building is clad with cedar shake to fit within it's resdiential neighborhood. 
Front of Residence
339

The Marion Residence 2016 / Keizer, OR

The Marion Residence is a new construction, single story home with 3 bedrooms, 2.5 baths and 3 car garage. The home features an open concept floor plan, a den with french doors, premier millwork, stone gas fireplace and modern finishes.
Harold Street Apartments
340

Harold Street Apartments 2016 / Portland, OR

Harold Street Apartments is a 14 unit apartment building located on a 6,290 SF lot in the Sellwood-Moreland neighborhood of Portland, Oregon. The building is comprised of five different studio and one bedroom floor plans. It features contemporary finishes, stainless steel appliances, quartz countertops, air conditioning, cable rail decks and bike storage.
310

Greens at Millcreek 2015 / Hubbard, OR

The Greens at Millcreek was a turn-key land development project for a local home developer. It included land acquisition, entitlement and site development. The infrastructure development included the installation of the mainline sewer, storm, water and power. It also included street construction of AC paving, curb and gutter, city sidewalks and street lighting.
311

Greens at Millcreek Site Development 2015 / Hubbard, OR

The Greens at Millcreek was a turn-key land development project for a local home developer. It included land acquisition, entitlement and site development. The infrastructure development included the installation of the mainline sewer, storm, water and power. It also included street construction of AC paving, curb and gutter, city sidewalks and street lighting.
312

Windsor Island Estates 2015 / Keizer, OR

Windsor Island Estates provides 54 new single family homes ranging from 1,682 to 2,184 SF on 5,000 SF lots. The one and two story homes feature a full fiber cement exterior, siding and trim, combined with stone veneer. The homes also feature fenced and landscaped yards with underground irrigation, granite countertops, custom cabinets and the opportunity for homeowners to customize their finishes.
Side Access Garage
286

North Burrage Residence 2015 / Portland, OR

The North Burrage Residence is a new construction, three story home with 3 bedrooms, 2.5 bathrooms and den on a 2,500 SF lot. This custom home provides high end finishes including walnut floors throughout main level, designer backsplashes in kitchen and bath, granite countertops and stainless steel gas appliances. It also features a cement board siding package, a side access garage and a covered patio.
3 Story New Construction Homes
287

Halleck 2015 / Portland, OR

Halleck is a high-density urban infill project in the City of Portland. It includes four new homes and one renovated home on lots ranging from 2,500 to 4,500 SF. The two and three story homes are 4 bedroom and 3 baths with a full fiber cement exterior, siding and trim. The homes also feature high end finishes including  quartz counters, full designer back splashes, double vanities, hardwood floors and gas appliances.
318

Independence Laundromat Tenant Improvement 2015 / Independence, OR

The tenant build out for the Independence Laundromat incorporated a new self serve laundry facility into an existing vacant space that was not previously built out. The tenant improvement included 26 washers, 11 stackable dryers, folding areas, seating areas, office, restroom and mechanical room.
Aerial
292

Riverplace Apartment Homes 2015 / Independence, OR

Nineteen buildings were added to 12.02 acres in Independence, Oregon. The buildings provide 204 units, clubhouse, sports court, playground and pool. The site allows residents to have access to future public sports facilities and the Willamette River which are adjacent from the development.
Aerial
319

Independence Retail 2015 / Independence, OR

Independence Retail can hold up to two independent tenants and a car wash. The project was developed in-house from concept to occupancy in four months.
A1 Martket
324

A1 Market Tenant Improvement 2015 / Independence, OR

The fast track tenant build out for A1 Market incorporated a convience store into an existing vacant space that was not previously built out. The tenant improvement included a retail area, 603 SF walk-in cooler, soda counter, restroom, office, kitchen and storage area.
294

River's Edge Hotel and Avalon Condominiums 2015 / Portland, OR

River's Edge Hotel and Avalon Condominiums occupies a unique building which combines several tenants and styles.  The building was originally constructed in 2001 as the Avalon hotel with a 99 room hotel and spa with condominiums on the upper floors.  In 2014 the Singerman group acquired the building and began the process of renovating the business and the building.
329

Evergreen Highway Remodel 2015 / Vancouver, OR

The Evergreen Highway Remodel required repair to the existing bluestone deck above the living space due to pre-existing dryrot. I&E Construction preformed the removal and replacement of the stone deck assembly including: stucco siding along base of the wall, french door and sill pan installation, bluestone, waterproof membrane, metal flashing, railings and acid washing.
working in public areas to minimize impact
330

Samaritan Village Senior Living 2015 / Corvallis, OR

This 83 unit senior living complex was constructed in the mid 1950s.  In typical fashion for the time the buildings were well constructed with what are small and cramped bathrooms and kitchens for today.  We are working with Samaritan Village and Cascade Management to update the spaces and improve their usability for residents.
Doricourt Apartments
303

Doricourt Apartments 2015 / Portland, OR

The tenant improvement for Doricourt Apartments consisted of removing and disposing of old steam radiators to incorporate electrical systems and cadet heaters in each apartment unit. The scope of work included extensive finish restorations, fire caulking and paint.
Front of Residence
307

Halleck Residence 2015 / Portland, OR

The Halleck residence is a two story home with 3 bedrooms, 2.5 bathrooms and loft on a 3,525 SF lot. The home has an open floor plan with a double height great room and bar. It also features high end finishes including Maple wood floors throughout the main level, designer back splashes in the kitchen and bathrooms, quartz counter tops, stainless steel gas appliances, rear entry garage and covered outdoor space.
Front of Residence
272

Angel Brook Residence 2014 / Silverton, OR

The 1,904 SF new construction home provides 3 bedrooms with walk-in closets, a den and 2 bathrooms. The vaulted foyer and custom casework provide an inviting entry into this open concept home.
Front of Residence
274

Silverton Residence 2014 / Silverton, OR

The new construction home in Silverton, Oregon is 1,693 SF and provides 3 bedrooms, a den and 2 bathrooms.
285

North Halleck Site Development 2014 / Portland, OR

This urban infill project to construct five home-sites included pre-development contouring, installation of erosion control and installation of all major utilities.
Front of Residence
314

Mulino Custom Home 2014 / Mulino, OR

This design-build project of a 3 bedroom and 2.5 bathroom custom home included full site development with the installation of septic and well. The home sits on 6 acres of land and was designed to capture the views of the surrounding forest. It features a full fiber cement exterior, stone veneer, timber trusses, coffered ceilings, quartz countertops, engineered hardwood floors, custom cabinetry, a sauna and a large covered deck.
Stucco joint replacement
212

SW Thomas Street Remodel 2014 / Portland, OR

The wood framed SW Thomas Street residence consisted of the removal and replacement of the exterior stucco assembly due to damage from pre-existing conditions.
213

Rockaway Shores Condominiums 2014 / Rockaway Beach, OR

Rockaway Shores Condominiums was in need of a complete exterior cladding, deck and roof repairs due preexisting moisture damage. The scope of work for the four story with below grade parking structure included removal and replacement of fiber cement siding, flashing, WRB, sheathing, installation, exhaust vents and trim. In addition the scope of work also included the removal and replacement of the storefront entry assembly, unit decks and roof assembly.
293

Riverplace Site Development 2014 / Independence, OR

The 12.02 acre mass excavation included pre-development mass contouring, cut-in and rock roadway subgrades, installation of erosion control, installation of all major utilities including water, sewer and storm, and construction of a public roadway.
During Construction
229

Seascapes Townhomes 2014 / Rockaway Beach, OR

Seascape Townhomes was in need of exterior envelope, cladding and deck repairs due to pre-existing moisture damage. The scope of work for the 6 buildings consisted of replacing all fiber cement siding, trim and WRB, rebuilding and replacing deck structures and glass rails, and installing waterproofing system and high performance flashing.
300

Windsor Island Site Development 2014 / Keizer, OR

The development included mass contouring, road construction and installation of all major utilities. In addition, I&E also constructed vegetative swales and plantings for storm drainage.
Front
267

Sage Street Residence 2014 / Silverton, OR

Sage Street residence is a 1,670 SF new construction home on a 8,000 SF lot. The home provides 3 bedrooms, 2 bathrooms with a media room or office.
302

Kirkwood Residence 2014 / Keizer, OR

The two story home has 3 bedrooms, 2.5 bathrooms, a den and a 3 car garage. The home's interior is fully upgraded with granite countertops, a full height kitchen backsplash, stainless steel appliances, hardwood and tile floors and wrought iron railings. It's exterior features a full fiber cement board siding system, stone wainscot, covered porch and patio, a fenced and landscaped yard with underground irrigation.
Front
268

Thyme Loop Residence 2014 / Silverton, OR

The Tyme Loop residence is a 1,670 SF new construction home placed on a 7,000 SF lot. It provides an open concept with 3 bedrooms, 2 bathrooms with media room or office.
Front of Residence
269

Mt. Angel Residence 2014 / Mt. Angel, OR

The new construction home in Mt. Angel is 1,653 SF and provides 3 bedrooms and 2 bathrooms with a den.
306

Sherwood High School 2014 / Sherwood, OR

I&E performed interior restoration of water damage to finishes and fixtures throughout Sherwood High School. The scope of work included replacing suspended ceilings and lighting, wall finishes, carpet, cabinets, desks and wall paneling.  This work was completed on an accelerated schedule during school breaks and off hours to accommodate students.
Courtyard Scaffolding
270

The Addison Exterior Maintenance 2014 / Portland, OR

The Addison was in need of several types of maintenance in repair work approx 10 years after initial construction.  With a tight site and difficult access the most effective solution was perform several types of work at once.
Front of Residence
271

Tate Avenue Residence 2014 / Keizer, OR

The 2,140 SF new construction home in Keizer, Oregon provides 3 bedrooms and 2 bathrooms with an option room. The kitchen opens up to the great room and dining nook to allow for a spacious, open concept.
Front of Residence
308

Albany Residence 2014 / Keizer, OR

The 1,870 SF home has 3 bedrooms, 2 bathrooms and an option room. It features a full fiber cement siding and trim, covered porch and patio, quartz countertops, laminate floors, stainless steel appliances and gas fireplace. 
204

Vintage Creek Townhomes 2013 / Sherwood, OR

The multifamily defect restoration project involved 71 townhomes which required exterior envelope repairs.  I&E Construction worked with the community manager and the HOA board to successfully restore these homes.
165

Meridian Village Townhomes 2013 / Beaverton, OR

The townhomes at Meridian Village suffered from siding and building envelope problems due to poor material selection and installation.  Repairs included siding and building envelope replacement, window replacement, dryrot and framing repairs, and partial roof repairs.
208

Christy Court 2013 / Winston, OR

Christy Court is a 34 unit rural apartment community in Winston, OR.  The owner wanted to improve the complex with some simple upgrades.  Replacing the sliding glass doors and exterior decks delivered great value in improving this community.
120

Axiom Electronics 2013 / Beaverton, OR

The tenant improvement project involved converting 73,000 SF of vacant office space on 2 levels to manufacturing and administrative space in the span of 4 months.  We remodeled the upper floor into administrative space for 100+ staff and converted the lower floor to precision manufacturing space by installing new electrical, HVAC, floors, specialty gas distribution and equipment.
121

Portland Road Crossing 2013 / Salem, OR

Portland Road Crossing is a retail center located in Salem, Oregon in close proximity to Interstate 5. This retail shopping center was developed and built on the site of a decomissioned gas station.  Three flex space buildings can hold up to eight independent tendants. The project was developed in-house from concept to occupancy in 26 months.
130

Eastwood Court 2013 / Portland, OR

This community revitalization project consisted of repairing and refreshing a 9 building apartment complex for Home Forward.  We conducted extensive framing repairs, repalced the building envelope, replaced windows, installed new siding, and repainted the entire property.
231

Mt. Angel 2013 / Mt. Angel, OR

Mt. Angel provides five new homes (3 bedroom and 2 bathroom) on 6,500 SF lots.
258

Mt. Angel Residence 2013 / Mt. Angel, OR

The 3 bedroom 2 bathroom single family home was constructed to provide efficient space for a family.
296

Residence at Domaine Serene Winery 2013 / Dayton, OR

At Domaine Serene Winery, I&E Construction modified existing framing and installed flashing, waterproof membrane and pedestal pavers over the garage to achieve proper slope for water drainage. In addition, the clay roof was repaired.
259

Tate Estates Custom Home 2013 / Keizer, OR

The single family 3 bedroom 2 bath home was constructed to provide a spacious, open floor plan for a family.
133

Portland Road Crossing 2013 / Salem, OR

Portland Road Crossing is a retail center located in Salem, Oregon in close proximity to Interstate 5. This retail shopping center was developed and built on the site of a decomissioned gas station.  Three flex space buildings can hold up to eight independent tendants. The project was developed in-house from concept to occupancy in 26 months.
Stoneplace Apartments Phase I and II
235

Stoneplace Apartments Phase II 2013 / Molalla, OR

Thirteen buildings on 4.36 acres were added next to the phase I apartments. The buildings will provide 107 luxury units, a sports court, a spa, and a clubhouse with a recreational room and a business center.
Getting the site ready with formwork and layout
141

Canyon Park Pump Station Upgrade 2013 / Lincoln City, OR

A new submersible pumping system with associated electrical and controls and a new building housing support equipment and public restrooms.
239

Lot 145 Mass Excavation 2013 / Happy Valley, OR

The 6.55 acre mass excavation included pre-development mass contouring, cut-in and rock roadway subgrades, installation of soil monitoring points to confirm site stability and installation of erosion control.
Work Completed
197

Conor Commons 2013 / Beaverton, OR

This association suffered from several consistent issues related to roof valleys, window integration, weather barrier installation, and structural framing.
Lobby
245

Vancouver Office Tenant Improvement 2013 / Vancouver, WA

The 3,500 SF tenant improvement included the renovation of the facade, lobby, reception area, conference rooms and restrooms to be ADA accessible. It also included adding new drywall, electrical and lighting.
160

Tate Estates 2013 / Keizer, OR

Tate Estates provides an unique blend of nine custom new homes and a remodeled home on lots ranging from 7,500 SF to 12,000 SF. The homes feature a full cement exterior, siding and trim, combined with stone veneer for a durable, maintainable home. They also feature fully fenced and landscaped yards, granite countertops, custom cabinets, gas appliances and engineered wood floors.
199

Lydia Lane 2013 / Lebanon, OR

This new construction single family home in Lebanon was constructed for a growing family of 3.
246

Main Place - OBEC Tenant Improvement 2013 / Vancouver, WA

The tenant improvement for OBEC Consulting Engineers, Inc. comprised of renovating 3,361 SF to create a new reception area, private offices, conference room, kitchen and server room. It also include adding new drywall, electrical and lighting.
After Construction
249

Forest Heights Remodel 2012 / Portland, OR

The Forest Heights remodel consisted of targeted repairs of exterior wall assemblies including the removal and replacement of wood siding, vinyl and aluminum-clad window assemblies, sliding glass doors and select interior repairs due to pre-existing conditions.
116

Arbor Reserve 2012 / Beaverton, OR

Arbor Reserve is a 202 unit townhome community which struggled with leaks and building envelope issues for several years.  Repair work consisted of partial siding and building envelope replacement, removal and reintegration of all windows, roof repairs, framing repairs, recoating of membrane decks, and new paint.  
250

Devoto Lane Remodel 2012 / Portland, OR

The Devoto Lane remodel required interior and exterior repairs due to damage from pre-existing conditions. I&E Construction performed the removal and replacement of siding, trim and deck to incorporate new rain screen cladding.
Exterior repairs
117

Hambach Crossing 2012 / Tigard, OR

This multifamily defect restoration project involved 30 townhomes which required extensive exterior envelope repairs.  
Before Construction
205

Clayborn Condominiums 2012 / Portland, OR

Clayborn Condominiums was originally constructed as part of an apartment complex in 1990.  They were subsequently converted to condominiums and in 2010 were in need of exterior restoration.
After Construction
251

Trail Road Remodel 2012 / Tualatin, OR

Due to damage from pre-existing building envelope failure, I&E Construction repaired cracks in stucco cladding, removed cedar roofing at specific locations to replace with IB roofing and general roof repair work for the residence.
283

Maytag Laundromat Tenant Improvement 2012 / Salem, OR

The Maytag Laundromat design-build tenant improvement incorporated a new self serve laundry facility into an existing vacant space that was not previously built out.
Work in progress at Graham Street
206

Graham Street Lofts 2012 / Portland, OR

Graham Street Lofts required remediation of several original construction defects. This challenging partial repair consisted of reintegrating windows, deck coating replacement and partial replacement of stucco and siding.
313

Jordan Motorz 2012 / Milwaukie, OR

The scope of work for Jordan Motorz included the installation of architectural sheet metal panels and T&G wood siding for cladding. It also included installation of new exterior soffit.
119

Rockwood Station 2012 / Portland, OR

Rockwood Station is an early 1990's apartment complex in need of repairs and restoration.  We completed repairs on the first building consisting of exterior envelope replacement, framing repairs, deck replacement and coating, and minor roof repairs.
174

Grand Mound Wastewater Treatment Improvements 2012 / Grand Mound, WA

Construction of new biofilter sludge tanks with all associated foul-air piping and slide gates. Aeration equipment and blowers were also installed for a complete bio-solid treatment facility.
175

Water Pollution Control Facility Phase B-2A 2012 / Everett, WA

Modifications to two existing Headworks biofilters and existing biofilter irrigation system. Assembled and balanced new 36" HDPE foul-air piping in existing Headworks structure and applied specialized coatings at fan building.
127

Martin Way Reclaimed Water Plant Membrane Upgrade 2012 / Lacey, WA

Municipal water system upgrades to the Lacey-Olympia-Tumwater utility system.  Work included modifications, additions and upgrades to the membrane system, sodium hypochlorite chlorination system, aeration basin cell sensor/sampling units, and plant-wide foam control system.
176

Tri-Met - Barbur Blvd Transit Center 2012 / Portland, OR

New stormwater system at Barbur Blvd Transit Center.  Work included construction of new "flow-through" stormwater planters, parking lot pole lighting, sidewalks, paving and striping.
257

Corrine Heights Remodel 2012 / Beaverton, OR

The Corrine Heights remodel consisted of targeted removal of exterior stucco and stone veneer assemblies. I&E Construction replaced the stucco assembly with cedar bevel siding and installed new stone veneer.
177

Well 4 Potable Water Corrosion Control Treatment Facility 2012 / Lacey, WA

I & E Construction performed the removal of existing equipment, structures and obstructions, installed new equipment, constructed a new structure, valves, piping and other equipment, and landscape restoration.
178

Clark Creek Road Culvert Replacement Project 2012 / Kelso, WA

Clark Creek Road culvert replacement project included installation of new steel arch culvert with cast-in-place concrete footings, stem walls and wingwalls and removal and repair of existing roadway surface including backfilling, grading, paving, and waterline relocation.
179

Vader-Enchanted Valley Water System 2012 / Chehalis, WA

Water System Improvement Project to include procurement, construction and connection to the existing water system of approximately 7,100 LF of 8-inch PVC water main replacement lines complete with valves, air release valve assembly, fittings and appurtenances; approximately 1,900 LF of 4-inch PE water transmission line complete with valves and fittings; approximately 80 service meter connections; 4 sampling stations; and 13 fire hydrant assemblies.
Storefront
185

NoSkinny Tenant Improvement 2012 / Vancouver, WA

The NoSkinny tenant improvement incorporated new store front, signage, floor coverings, stained concrete, drywall and lighting.
Finished home exterior
157

Raleigh Hills Remodel 2012 / Portland, OR

This extensive remodel updated a 1972 home to a current look and feel.
158

Mosier Creek Townhomes 2012 / Mosier, OR

This 34 unit townhome and flat development required repairs and remediation in part due to their unique environment.  Mosier, OR sits at the intersection of the Eastern Oregon high desert and the Columbia River Gorge.  Mosier routinely experiences unusually high winds and rain which contribute to building envelope challenges which required repairs.
244

Well No. 9 Treatment Building 2012 / Port Orchard, WA

The Well No. 9 project consisted of the installation of a VFD motor for an existing submersible well pump, a 20' x 24' CMU treatment building with metal roof, a 35' x 19' x 6' deep in ground concrete clearwell, three vertical turbine pumps, a dehumidifier, heater, exhaust fans, a new generator and concrete pad, new electrical wiring and controls.
159

Padgett Road Remodel 2012 / Hillsboro, OR

The Hillsboro farmhouse was completely remodeled to get it rental ready.
Sheathing and roofing replacement
118

Oak Creek Meadows 2011 / Aloha, OR

This challenging project for C&R real estate involved extensive structural repairs, building envelope replacement, and window replacement. 
172

Highway 99E Sidewalk Infill 2011 / Milwaukie, OR

New infiltration ditches along Highway 99E to improve stormwater management.
211

Columbia Shores Condominiums 2011 / Vancouver, WA

Columbia Shores is a multifamily defect restoration project. I &E Construction performed a complete restoration of the 140 unit complex. The work included removing the existing building envelope and cladding, repairing dry rot and structural system, installing new building envelope and rainscreen, new siding, new windows and replacing roofs.
254

Tower Road Bridge 2011 / Toutle, WA

Repaired existing concrete bridge piers to accommodate traffic loads on Tower Road Bridge.  Work included constructing cofferdams around piers to allow for pier replacement.
255

Linfield College Northup Hall 2011 / McMinville, OR

Below grade waterproofing and civil package including water lines, fast-track mass excavation and structural backfill around the perimeter of the building and full utilities package to include storm water, sewer and steam pipe excavation.
After Construction
256

Stone Creek Drive Remodel 2011 / Beaverton, OR

The Stone Creek Drive residence required full siding and window repairs due to damage from pre-existing conditions. I&E Construction also performed geotechnical repairs including settling of back patios and columns and compaction of soils.
186

Hush Hush Cafe 2011 / Portland, OR

The restaurant expansion tenant improvement for Hush Hush Cafe incorporated a neighboring retail space into the existing restaruant to create a larger dining area and an ADA bathroom.
253

Gut Creek - Zimmerman Road Culvert Replacement Project 2010 / Aurora, OR

Removed existing culvert and replaced with 10' aluminum-steel corrugated culvert for stormwater management. Complete road construction was included.
The completed lobby with matching curved counter and soffit
122

Fountain Valley Dental 2010 / Molalla, OR

This ground-up dental office was designed by its owner/occupant.  He started the project with a very specific vision for his new office.  We had the pleasure of making Dr. Borromeo's vision a reality and creating a 6 chair office finished like a comfortable home. 
198

Angel Brook 2010 / Silverton, OR

Angel Brook is a twelve lot subdivision of 3 bedroom and 2 bathroom new construction homes on lots ranging from 7,000 to 10,000 SF.
161

Thomas Estates 2009 / Lebanon, OR

Thomas Estates is comprised of twenty new homes (3 bedroom and 2 bathroom) on lots ranging from 6,080 to 7,750 SF.
162

Collins Lake 2009 / Government Camp, OR

This project is in a small mountain town at the base of Mt. Hood.  Because of being heavily affected by the seasons, it was imperative this project be started and finished within a very specific time window of 3 months.   This was made even more difficult by the tight narrow confines of the small community.
173

City of Elgin Waterline Replacement 2009 / Elgin, OR

Replaced residential waterline, water meters and fire hydrants. 5,000 LF of 8" water line; 2,780 LF of 6" water line; 1,295 LF of 1" water line; 790  water meters and 13 fire hydrants.
132

Stoneplace Apartments Phase I 2008 / Molalla, OR

Stoneplace Apartments is an 80 unit apartment complex comprised of one and two bedroom units between 725 and 1,100 SF. The complex is oriented around parking and common spaces with a community building, pool, and playground. It was developed to fill the need for quality rental housing in Molalla and has been fully occupied since completion. 
233

Goose Hollow Custom Home 2007 / Woodburn, OR

New construction of a 2,500 SF custom home on Tukwila Golf Course.
252

Molalla Custom Home 2006 / Molalla, OR

New construction of 5,400 SF custom home with full site development including the installation of pool, septic and well.