- Removed loose concrete in parking garage, patched cracks, and repainted walls
- Removed and replaced topping slab and stone veneers to waterproof the underneath concrete
- Added steel plates with through-bolts securing rail posts and seat laminated glass into existing C-channels at rail posts
